Tim's Schedule for: 5/29- 6/7:  Out of office. I will check emails and phone messages every other day or so.

 

Updated: Sat.,  5/27, 8:01 a.m.   

I update this at least once a day, M-F, except when out of the office.

 

Approx Backlog:  7 weeks

This is from the Updated date above until I can start a job NOT in the queue. Jobs are entered in the queue only after a signed contract is in place. I usually turn around proposals in one day.  

Current Jobs in Queue 

Jobs are listed here only after a contract is in place.

Job Name (address) Desc'r

E

H

R

Est'd Start % Com-plete Waiting On Waiting For...
1120 NGar 16 7/26 0 Arch final plans
Lot128 NRes 16 7/19 0 - -
12342 Add'n 6 7/17 0 Arch final plans in pdf
1 NRes 24 7/5 0 Arch final plans and blanks
515 Barn 16 7/3 0 Arch plans and blanks
UplndLG 3NRes 40 6/28 0 Arch plans and blanks
DF1800 NRes 16 6/21 0 - -
DF1494 NRes 16 6/19 0 - -
6588 NGar 20 U 10 - -
DF1636 NRes 0 D 100 Owner payment
515 Canopy 2 H 90 Arch review draft engr'g
TC#4 NRes 0 D 100 Owner payment
1306 NRes 24 ? 0 Arch final plans
TC#56 NRes 0 D 100 Owner payment
TC#55 NRes 0 D 100 Owner payment
14689 BarnAdn 14 H 10 Arch new concpt okay?
4493 Add'n 1 H 95 Arch review draft engr'g
6526 LiftBldgs 18 H 10 Arch contr expose framing
4749 Remdl 2 H 95 Arch incorporate engr'g
3393 NRes 4 H 90 Arch incorporate engr'g
31327 Remdl 2 H 95 Arch incorporate engr'g

Job Name: If a number, that's the project's physical street address. If letters, that's an acronym for a company name, street name, project name, etc. 

 

The order in the table is generally the order received, most recent at top, but does NOT necessarily reflect the order in the queue due to previous commitments, items not ready, other priorities, etc.

 

Description: NRes = New Residential building; Re = Remodel / Addition; NMul = New Multifamily building; Deck = Deck repair, addition, or modification; Addn = Addition; Adndm = Addendum; BC = Business Consultation; Fdn = Foundation or retaining wall; Spk = Speaking Engagement; SI = Structural Investigation; SR = Structural Repair. TI = Tenant Improvement.

 

EHR:  Estimated Hours Remaining = the approximate number of office hours remaining to finish the project. This is just an estimate, mostly for my time management purposes.

 

Est'd Start:  If a date is listed that's the estimated start date.

Dates with a star, *, are firm. U = Underway. D = Done. H = on Hold.

 

? = I can't start because I'm waiting on something from Arch or Client. When I receive that needed info I will start as soon as possible, IE these projects keep their position in my queue for approximately a month. If there is no activity on a queued project for over a month, I delete them from my schedule. If they come back they'll have to start over with a new start date. 

 

Waiting On: Arch = the architect / designer needs to supply me a detail, drawing, or document. Bldr = the builder needs to provide information, document, review, etc. Client or Owner = usually means I'm waiting on the client for a decision or a payment. Jur = I'm waiting on something from the reviewing jurisdiction.

 

"Blanks" or "Clean plans" are floor plans and foundation plans to scale in pdf format just showing the linework - no dimensions, text, shading, hatching, etc. I use these for structural sketches and base drawings.

 

"Review draft engr'g" means that the "Waiting on" person has been supplied with my draft engineering plans and needs to look them over to be sure they're in synch with the architectural plans. With this review and approval I then assemble my final structural drawings, seal and distribute them.